Direct answer
Water pressure pushes against waterproofing from the wet side. Positive-side systems sit on that wet side—external wall membrane, raft membrane under slab, tank lining on the water face—so pressure helps seal laps to concrete. Negative-side systems sit on the dry interior; water pushes away from the bond line, which limits long-term reliability under full hydrostatic head unless the product is explicitly rated and the structure is cracked-stabilised.
Petroseal specifies positive-side PetroGrip SBS (and double-layer build-ups) for new basements, rafts, and tanks where excavation or formwork access exists. Negative-side cementitious or injection approaches are discussed only after diagnosis on retrofit work—not as a default substitute for external membrane on greenfield projects.
Comparison
| Aspect | Positive-side | Negative-side |
|---|---|---|
| Water pressure effect | Presses membrane into substrate/laps | Pushes water toward interface—higher disbond risk |
| Typical new build | External SBS torch + protection | Not a substitute for external line |
| Retrofit basement | External if excavatable | Internal coating/injection if access blocked |
| Petroseal primary products | PetroGrip SBS, waterstops, double-layer specs | Cementitious system page + specialist remediation quote |
Positive-side build sequence (new basement)
- Prepare concrete: cure, dry, repair defects; verify reglet and upturn heights.
- Prime per PetroGrip method; torch or self-adhesive primary SBS ply.
- Detail raft-to-wall, penetrations, and construction joints with waterstops.
- Install protection board or screed before sharp backfill.
- Hold inspection and photograph laps before cover-up.
Contractors such as Unicorn or Roof Power may install positive-side systems using various membrane brands; Petroseal supplies Lahore-manufactured rolls with traceable marking and publishes method guidance on download pages.
Negative-side limits
Active leaks through structural cracks may migrate past internal coatings if movement continues. Negative-side cementitious systems can perform on stable, low-movement structures with controlled head—consult Petroseal’s cementitious system page for scope. High water-table basements without external membrane rarely achieve dry occupancy with interior paint-alone solutions marketed generically in Punjab.
Do not confuse DPC/rising damp treatments (PetroDPC) with full basement negative-side tanking—they address different moisture paths.
Tanks and retaining structures
Water tanks and retaining walls normally receive positive-side membrane or geomembrane on the water face. Petroseal supplies PVC waterstops for joints and HDPE/PVC liners where sheet lining replaces bitumen. Positive-side placement is non-negotiable for primary containment unless a fully engineered alternative is stamped.