Direct answer

Water pressure pushes against waterproofing from the wet side. Positive-side systems sit on that wet side—external wall membrane, raft membrane under slab, tank lining on the water face—so pressure helps seal laps to concrete. Negative-side systems sit on the dry interior; water pushes away from the bond line, which limits long-term reliability under full hydrostatic head unless the product is explicitly rated and the structure is cracked-stabilised.

Petroseal specifies positive-side PetroGrip SBS (and double-layer build-ups) for new basements, rafts, and tanks where excavation or formwork access exists. Negative-side cementitious or injection approaches are discussed only after diagnosis on retrofit work—not as a default substitute for external membrane on greenfield projects.

Comparison

AspectPositive-sideNegative-side
Water pressure effectPresses membrane into substrate/lapsPushes water toward interface—higher disbond risk
Typical new buildExternal SBS torch + protectionNot a substitute for external line
Retrofit basementExternal if excavatableInternal coating/injection if access blocked
Petroseal primary productsPetroGrip SBS, waterstops, double-layer specsCementitious system page + specialist remediation quote

Positive-side build sequence (new basement)

  1. Prepare concrete: cure, dry, repair defects; verify reglet and upturn heights.
  2. Prime per PetroGrip method; torch or self-adhesive primary SBS ply.
  3. Detail raft-to-wall, penetrations, and construction joints with waterstops.
  4. Install protection board or screed before sharp backfill.
  5. Hold inspection and photograph laps before cover-up.

Contractors such as Unicorn or Roof Power may install positive-side systems using various membrane brands; Petroseal supplies Lahore-manufactured rolls with traceable marking and publishes method guidance on download pages.

Negative-side limits

Active leaks through structural cracks may migrate past internal coatings if movement continues. Negative-side cementitious systems can perform on stable, low-movement structures with controlled head—consult Petroseal’s cementitious system page for scope. High water-table basements without external membrane rarely achieve dry occupancy with interior paint-alone solutions marketed generically in Punjab.

Do not confuse DPC/rising damp treatments (PetroDPC) with full basement negative-side tanking—they address different moisture paths.

Tanks and retaining structures

Water tanks and retaining walls normally receive positive-side membrane or geomembrane on the water face. Petroseal supplies PVC waterstops for joints and HDPE/PVC liners where sheet lining replaces bitumen. Positive-side placement is non-negotiable for primary containment unless a fully engineered alternative is stamped.